AIR CONDITIONING INSTALLATION

AIR CONDITIONING INSTALLATION

Service Description
Charge from installer to customer

Cleaning of refrigerant pipes with nitrogen, per installation, in cases of:

  • Where there are open pipes.
  • Moisture in the circuit: €10.00
    Removal of air conditioner (9000-24000 BTU): €20.00
    Use of additional copper pipes (per meter):
  • For air conditioners 9K to 14K BTU: €18.00
  • For air conditioners 16K to 24K BTU: €20.00

Adding refrigerant gas in cases where the distance from the outdoor unit to the indoor unit exceeds the manufacturer’s recommended distance (per kilogram): Base charge: €15.00

  • €50.00/kg

Use of additional water drainage pipe (per meter): €3.00
Use of additional power supply cable cover duct (per meter): €6.50
Use of copper pipe cover duct (per meter): €12.00

Installation of heater switch:

  • In existing box: €20.00
  • In another location with external box: €35.00

Installation of external isolator according to the regulations of the Electricity Authority:

  • If armored cable is needed (per meter): €3.00
  • If a technician is needed for inspection by the Electricity Authority: €50.00
  • On-site technician presence: €50.00

Installation of plastic floor base for outdoor unit: €30.00
Installation of metal wall base for outdoor unit:

  • For air conditioners 9K to 14K BTU: €35.00
  • For air conditioners 16K to 24K BTU: €40.00

Use of lifting machine (per hour): €59.50

  • There may be additional charges for more difficult installations that cannot be calculated in advance.
  • Our company does not undertake drilling in concrete or stone walls, columns, or beams.
  • All prices above include VAT.

The term “installation” includes the following services:

  • Unpacking the unit.
  • Installing and connecting the air conditioner at a location specified by the customer or indicated based on the conditions of the space (according to necessary requirements).
  • Demonstration of use and explanation of basic functions and components.

Installation Requirements:

  • The maximum distance between the indoor and outdoor units is 3 meters, which includes the connecting cable of the air conditioner to the power supply and the water drainage pipes from the indoor unit.
  • All cables are covered with trunking; copper pipes are separately insulated with Armaflex and bundled together with white adhesive tape.
  • In all air conditioners, the power supply must be connected to a Heater Switch, unless the customer prefers a 13Amp plug only for air conditioners from 9K – 12K BTU.
  • The water drainage pipe from the indoor unit extends to the ground with drainage in Heating Mode, except for high-rise buildings, where the endpoint will be discussed and agreed with the customer on-site.
  • When holes are made in the wall for passing pipes, they are filled with suitable material.
  • “Vacuum” is absolutely necessary on the pipes after connecting the air conditioners.
AIR CONDITIONING INSTALLATION

Scroll to Top